This three-bedroom apartment is located in a residential development in Vila Nova de Gaia, offering a sustainable, family-friendly, exclusive, and dynamic environment. It represents the perfect balance between nature, architecture, and innovation, allowing residents to enjoy a better quality of life.
The layout of the property is as follows:
- An open space encompassing the living room, dining room, and kitchen, measuring 26 sqm.
- A spacious suite covering an area of 20 sqm.
- Two bedrooms measuring 11 sqm and 10 sqm each respectively.
- A shared bathroom measuring 4 sqm.
- A balcony spanning 11,4 sqm.
Residents will also have access to a parking space.
This gated community stands out for its differentiation and originality due to:
- Its privileged location with quick access to major roads.
- Sustainability in the choice of materials and construction techniques.
- Common areas including a gym, playground, garden, lounge/coworking space, and bicycle parking.
Location:
- 200m from schools.
- 1.5 km from Arrábida Shopping Center.
- 1.5 km from a supermarket.
- 1.5 km from a pharmacy.
- 1.5 km from a hospital.
- 14.8 km from the airport.
Construction is scheduled to begin in the first quarter of 2024, with the concrete structure expected to be completed by May 2025. The deed signing phase will take place during the first semester of 2026.
The layout of the property is as follows:
- An open space encompassing the living room, dining room, and kitchen, measuring 26 sqm.
- A spacious suite covering an area of 20 sqm.
- Two bedrooms measuring 11 sqm and 10 sqm each respectively.
- A shared bathroom measuring 4 sqm.
- A balcony spanning 11,4 sqm.
Residents will also have access to a parking space.
This gated community stands out for its differentiation and originality due to:
- Its privileged location with quick access to major roads.
- Sustainability in the choice of materials and construction techniques.
- Common areas including a gym, playground, garden, lounge/coworking space, and bicycle parking.
Location:
- 200m from schools.
- 1.5 km from Arrábida Shopping Center.
- 1.5 km from a supermarket.
- 1.5 km from a pharmacy.
- 1.5 km from a hospital.
- 14.8 km from the airport.
Construction is scheduled to begin in the first quarter of 2024, with the concrete structure expected to be completed by May 2025. The deed signing phase will take place during the first semester of 2026.