T3+1 Duplex Apartment with a Total Area of 350m2.
Located on the third floor, it comprises an open kitchen to the living room with a total area of 85m2 on the first floor and allows access to a 30m2 balcony with unobstructed views over the Douro River.
On the upper floor, it features three suites and one bedroom, with the master suite having 30m2 and access to a 12m2 balcony.
Features:
- Access to a common pool, gym, paddle courts, sauna, and Turkish bath.
- Box for two cars
- Private parking space
- Solar and photovoltaic panels (common areas)
- Superior and sustainable quality finishes
This is a luxury private condominium overlooking the Douro River with fantastic panoramic views.
It is a short walk from the D. Luís Bridge and Ribeira do Porto, ten minutes by car from the historic city center, near access to the Via de Cintura Interna (VCI), and the main road and rail axes.
Located:
- 25 minutes from Porto airport;
- 15 minutes from the sea;
- 5 minutes from the train station;
- 5 minutes from Porto city center.
Expected completion in 2025.
Located on the third floor, it comprises an open kitchen to the living room with a total area of 85m2 on the first floor and allows access to a 30m2 balcony with unobstructed views over the Douro River.
On the upper floor, it features three suites and one bedroom, with the master suite having 30m2 and access to a 12m2 balcony.
Features:
- Access to a common pool, gym, paddle courts, sauna, and Turkish bath.
- Box for two cars
- Private parking space
- Solar and photovoltaic panels (common areas)
- Superior and sustainable quality finishes
This is a luxury private condominium overlooking the Douro River with fantastic panoramic views.
It is a short walk from the D. Luís Bridge and Ribeira do Porto, ten minutes by car from the historic city center, near access to the Via de Cintura Interna (VCI), and the main road and rail axes.
Located:
- 25 minutes from Porto airport;
- 15 minutes from the sea;
- 5 minutes from the train station;
- 5 minutes from Porto city center.
Expected completion in 2025.